
Exterior Plaza Renderings on East Ridge High School
WOODBURY, MN (WNN) – Construction on updates to East Ridge High School is slated to start in March.
The construction will consist of a number of things including:
Construction of an addition to increase the capacity of the school to 2,300 students.
A kitchen and cafeteria expansion to serve future student population growth.
Construction of additional Career and Technical Education and Science, Technology, Engineering and Math (STEM) spaces to support future growth and curricular offerings.
Reconfigured drive lanes and parking lot to enhance traffic flow and safety for parent pickup and drop-off.
A redesigned plaza space at the Athletics and Activities entrance.
Renovation of existing spaces to expand and enhance Special Education and Online learning.
The South Washington County School District released the artist’s rendering on a number of parts of the project.
PAST COVERAGE: Council OKs East Ridge High School Expansion